Laserfiche WebLink
<br /> <br />r-~ <br />LJ <br />Mazch 2000 <br />-2- <br />993-2099.150 <br />• Appendix B-1 Phase IV Material Property Testing <br />• Appendix B-2 Liner Load Testing <br />- Appendix B-2-1 Results of Liner Load Testing (1999) <br />- Appendix B-2-2 Results of Liner Load Testing (2000) <br />• Appendix B-3 Drain Cover Fill Permeability Testing <br />• Appendix B-4 Cresson Ore Percolation and Consolidation Tests <br />- Appendix B-4-1 Percolation Test Results (1999) <br />- Appendix B-4-2 Percolation Test Results (2000) <br />• Appendix B-5 Ore Shear Strength Test Data <br />- Appendix B-5-1 1 1/2 Inch Minus Cresson Ore Shear Strength <br />Test Results (1996) <br />- Appendix B-5-2 '/< Inch Minus Cresson Ore Shear Strength <br />Test Results <br />• Appendix B-6 Interface Shear Strength Testing <br />- Appendix B-6-1 Phase IV Interface Shear Strength Testing <br />- Appendix B-6-2 Interface Shear Strength Testing for Phase I <br />(Ironclad Borrow Area 1993) (Originally <br />Submitted as Part of Amendment Nos. 6 and 7) <br />- Appendix B-6-3 Interface Shear Strength Testing for Phase II <br />(Borrow Area No. 5 1996a) (Originally <br />Submitted as Part of Amendment Nos. 6 and 7) <br />- Appendix B-6-4 Interface Shear Strength Testing for Phase HI <br />(Borrow Area No. 2 1996b) (Originally <br />Submitted as Part of Amendment Nos. 6 and 7) <br />- Appendix B-6-5 Interface Shear Strength Testing for Borrow <br />Area No. 2 (1996c) (Originally Submitted as <br />Part of Amendment Nos. 6 and 7) <br />• Appendix B-7 Cresson Ore Data <br />- Appendix B-7-1 Cresson Ore Draindown Data <br />- Appendix B-7-2 Cresson Ore Moisture Data <br />- Appendix C Design Calculations <br />• Appendix C-1 Geogrid Calculations <br />• Appendix C-2 Geomembrane Tensile Strength and Anchor Trench <br />Calculations <br />• Appendix C-3 Primary Solution Collection Pipe Burial Calculations <br />• Appendix C-4 Primary Solution Collection Pipe Flow Calculations <br />• Appendix C-5 PSSA Riser Pipe Calculations <br />• Appendix C-6 Phase III Ore Slope Settlement Calculations <br />• Appendix C-7 Phase IV Native Ground Settlement Calculations <br />• Appendix C-8 High Volume Solution Collection System Piping <br />Calculations <br />• Appendix C-9 Existing Pipe Burial Calculations <br />• Appendix C-10 Underdrain Flow Calculations <br />I:\99\t099\FINAL REPORTl099MAIN2.DOC Golder Associates <br />