My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96987
DRMS
>
Back File Migration
>
Revision
>
REV96987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:29 AM
Creation date
11/22/2007 12:05:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
1.0 INTRODUCTION
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />March 2000 <br />-10- <br />993-2099.150 <br />- Typical Solution Application Rate approximately 0.0045 <br /> gpm/fiz <br />- Average Leach Area 1.5 million square feet <br />- As Delivered Ore Moisture Content 5.6 percent (average <br /> 1998 and 1999) <br />- Field Capacity Ore Moisture Content 7.5 percent (average) <br />- Phase I PSSA Typical Operating Head 30 feet <br />- Phase II PSSA Typical Operating Head 20 feet <br />- Phase IV PSSA Typical Operating Head 20 feet <br />- Draindown Period 12 hours <br />- Precipitation Fluctuations 95 percent confidence limit <br />- Storm Event 100-year, 24-hour <br />• <br />• <br />- Minimum Phase H and IV <br />PSSA Freeboard 5 feet <br />- Minimum Phase I PSSA Freeboard 3 feet <br />- Phase I Area (plan area) 4.6 million square feet <br />- Phase II/III Area (plan area) 5.2 million square feet <br />- Phase IV Area (plan area) 6.7 million square feet <br />(7.8 million square feet - <br />surface area corrected for <br />slope) <br />Phase IV PSSA Liner System (see Section 4.6) <br />- Soil Liner Fill 12 inches minimum <br />(10-6 cm/sec) <br />1:\HV~1099\FINAL REPORT3099MAIN3.~OC Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.