Revised June 13, 1984 <br /> <br />Presented herein are calculations of mobile equipment <br />operating costs, revegetation costs and assumptions, followed by <br />detailed calculations for the estimated actual cost to completely <br />reclaim the area disturbed under current conditions (e.g., June 1, <br />1984). <br />References used include: <br />1. Cat Performance Handbook, Edition 10 <br />2. Rental Rate Blue Book for Construction Equipment, <br />published by Dataquest Incorporated <br />3. Kerr Coal Company, Bonding Calculations for Permit No. <br />C-006-80 (Exhibit 58) <br />4. Energy Fuels Corporation, Bonding Calculations by Rick <br />Mills and James Griffin for Permit No. 79-177 <br />•: <br />5. Mountain West Environments, Steamboat Springs, Colorado <br />6. Rocky Mountain Surveyors, Oak Creek, Colorado <br />7. Kerr Coal Company - September, 1983, Temporary Cessation <br />of Operations Map <br />Cost/Hour for Cat 657 P-P <br />Monthly Rate: 530,145 <br />Assumptions: <br />Work 6 days/week: 26 days/month; 2 shifts/day; 8 hours/shift <br />Cost/hour = $30,145 r 26 2 o- 8 = S 72.46/hour <br />Location adjustment = 572.46/hour x 1.04 = S 75.36/hour <br />Operator Cost per hour = S 13.93/hour <br />Operating Cost per hour = S 95.85/hour <br />TOTAL = 5185.14/hour <br />~j <br />