Laserfiche WebLink
Cross-reference Index to Proposed Permit Document Changes Resulting <br />From Trapper Mining Inc. Permit C-81-010 PR-O6 Submittal <br />Permit Page No(s)/ <br />Section Maps Changes & Comments <br />T of C iv-4 Reference to Map M57 removed. <br />1.0 1-1 Permit term years updated. <br />1.2.2 Map M57 This SPCC Location map is removed from the permit document because with <br />MR-195 the SPCC plan was removed from the permit document and is <br />instead referenced in Table 1.2-1 (page 1-10). The Division is supplied <br />with a stand alone copy of the SPCC Plan. <br />1.2.2.1 1-8 Renewal dates updated. <br />1.2.2.2 1-8 Reference date for Table 1.2-2 updated. <br />1-9 Table 1.2-1. Permits and licenses for Trapper operations updated. <br />1-11 to 1-12 Table 1.2-2. Permits and licenses for Trapper affilate operations updated. <br />1.4 1-31 to 1-59a Revised bonding section to reflect new mine plan. <br />Map M6 Bonding map updated for PRA. <br />1.5 1-61 Figure 1.5-1A. Updated liability insurance certificate. <br />1.6 1-62 Updated compliance record. States that no NOV's received during previous <br />three years. <br />1.7.1 1~4 New public notice information for PR-5. <br />1-65 New Figure 1.7. Proposd TMI permit boundary and affected area. <br />2.7.5.4 2-524 to 2-524a Updated list of water well completions in certain aquifers within 1 mile of permit. <br />2.7.5.5 2-524e to 2-524g Table 2.7-22c (water rights) updated with current DWR information. <br />Map M31 Revised 2000 scale Water Rights map . <br />3.1 3-2 Term of permit reference updated. <br />3.1.2 Map M4 Revised 1,000 scale Life of Mine Plan map. <br />3.1.4 3-10 Table 3.1-1. Revised maximum annual production. <br />3-11 Table 3.1-2. Trapper Mine major equipment list updated. <br />3-13 Table 3.1-3. Projected disturbance/reclamation for PR-6 updated. <br />3.1.4.1 3-15 to 3-15a Mining sequence narrative updated for PR-6. <br />Map M10A Revised 400 scale Mining and Regrade map (3 sheets). <br />Map M10B Revised 400 scale Topsoil SUipping and Reclamation map (3 sheets). <br />3.1.4.2 3-15b Updated highwall mining narrative <br />