My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96850
DRMS
>
Back File Migration
>
Revision
>
REV96850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:23 AM
Creation date
11/22/2007 12:04:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
1/30/2001
Doc Name
TECHNICAL REVISION 33
From
WALKER BYRON
To
MACDONALD DON
Type & Sequence
TR33
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />Walker, Byron <br />To: MacDonald, Don <br />Subject: RE: Technical Revision No. 33 <br />Don MacDonald <br />Thank you for attending to this matter. The suspense of February 28, 2001 is accepted. The Division of Minerals and <br />Geology has no questions at this time. Byron G. Walker <br />-----Original Message----- <br />From: MacDonald, Don [mailto:Don.MacDonald®coors.com] <br />Sent: Tuesday, January 30, 2001 5:59 PM <br />To: 'Byron Walker' <br />Subject: Technical Revision No. 33 <br />Mr. Byron Walker <br />Colorado Division of Minerals and Geology <br />Dear Sir: <br />Based on our several meetings and discussions concerning corrections to this <br />Technical Revision, more specifically the changes to the Permit Area Map for <br />the Keenesburg Mine site, Coors Energy Company asks that a final decision <br />concerning the approval of Technical Revision No. 33 be further postponed <br />for a period sufficient to allow for the preparation and submittal of <br />clarifications and corrections to the descriptions as found in that map. As <br />you are aware, our discussions have resulted in the need to redraft and <br />rework portions of the map which are outside the normal scope of the aerial <br />survey mapping. The mapping Tirm has been contacted and is reworking the <br />photo information to provide the baseline for the rework. Terranext <br />believes that if the mapping firm's time estimate is correct, they can turn <br />the map back to us for review with you by about February 10. Text <br />adjustments are also being made, for your consideration. <br />W hile I am optimistic that we can complete this process by the middle of <br />February, I would suggest an extension to the end of the month, to make sure <br />everything is complete. Please contact me if you have any questions or <br />concerns. <br />Donald W. MacDonald <br />Coors Energy Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.