My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96777
DRMS
>
Back File Migration
>
Revision
>
REV96777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:21 AM
Creation date
11/22/2007 12:03:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
8/13/1998
Doc Name
BOWIE 2 MINE TR APPLICATION PERMIT C-96-083
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES <br />2788 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81508 <br />PHONE: (970) 245101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />August 11, 1998 <br />J. J. Dudash <br />Division of Minerals & Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie No. 2 Mine <br />Technical Revision Application <br />Permit C-96-083 <br />Dear Mr. Dudash: <br />iii iiuiiiiiiiii iii <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />AUG 1 31998 <br />DIV. OF MINERALS <br />During the last week of July, a significant rainfall event occurred at the site. The <br />resultant run-off combined with gravel, mud and rocks plugged culvert C-9. The <br />Operator does not believe that the culvert will be recovered. Therefore, enclosed is an <br />application for a technical revision which provides for an open channel ditch to handle <br />the run-off previously handled by culvert C-9. The following changes were made to the <br />site drainage system as part of this technical revision application: <br />1) Ditch C5 will be replaced by a drop inlet (See Map 34 -Drop Inlet Detail). A <br />short new culvert C13 will be installed from the collection box to handle the run- <br />off previously collected by ditch C5. <br />2) The 4" ADS drain from the spring to Ditch C12 was added to all of the maps. <br />3) A short 36" diameter culvert C9 will replace culvert 618. <br />4) The new open channel ditch is comprised of two sections, C16 and C14. Ditch <br />C16 is a V-Ditch and C14 is a trapezoidal section. Ditch C14 will be extended <br />up to near the inlet of culvert 65. <br />5) Culvert 618, ditch 625 and culvert 65 are deleted from the drainage plan as a <br />result of this revision. <br />
The URL can be used to link to this page
Your browser does not support the video tag.