My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-11_REVISION - M1977132 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977132
>
2002-04-11_REVISION - M1977132 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:58:23 PM
Creation date
11/22/2007 12:03:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977132
IBM Index Class Name
REVISION
Doc Date
4/11/2002
Doc Name
Revised pages and maps
From
Greg Lewicki and Assoc.
To
Rio Blanco County
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The highest production rates for the site are as follows: <br />I~ <br />r~ <br />Commodity Annual Production <br />Rate Comments <br />Sand and Gravel 250,000 tons/yr Many years may not mine this amount <br />Asphalt 50,000 tons/yr Many years may not have any production <br />Concrete 10,000 cu.yds/yr Many years may not have any production <br />2. Mining Timetable <br />The following timetable is a best estimate of the sequence of operations for the life of the mine after <br />March of 2002 and is based on mining and selling 100,000 tons of total product per year (this is less <br />than the permit rates but are expected averages): <br />Task Description Time Needed <br />1 Finish mining east of existing Berry Pit 3 months <br />2 Construct sediment pond in sw corner of disturbed area 0.25 months <br />3 Strip soil and overburden from Strip 1 0.25 months <br />4 Mine Strip 1 18 months <br />5 Repeat Tasks 3 and 4 for Strips 2,3,4,5,6,7,8,9 (reclaim previous strip) 126 months <br />6 Mine and reclaim area of visual berm, Strips 10, 11, 12 42 months <br />7 Backfill overburden and soil in Strip 12 0.5 months <br />8 Regrade old pit area and stockpile area 0.5 months <br />9 Retopsoil processing area and stockpile area 0.25 months <br />10 Reseed and mulch last 4 strips, processing area and stockpile area 0.25 months <br />Total: 192.5 months <br />Note: If large contracts are awarded to the site, production could increase to the permit maximum, <br />thereby curtailing the life of the pit. On the other hand, if contracts are less than anticipated, the life of <br />the pit could be extended. This table is based on a reasonable projection of average production rates. <br />Berry Pit 3/02 <br />