Laserfiche WebLink
Revisions Mrde to Drawing C--t <br />Mar 8, 20U1 <br />(Now Known as Drawing C-dc) <br />I. Acreages of the topsoil stockpiles have been removed. <br />?. The truck shop has been relocated to the south of the previous location. <br />.;. The employee parking lot at the Ironclad Maintenance area has been added. <br />~. The ready line has been relocated slightly to the nonh+vest. <br />S. The topsoil stockpile in the vicinity of the Ironclad Maintenance Facilin~ has been relocated to an <br />existing stockpile. <br />6. The explosives magazines have been relocated to the west side of the hill. <br />7. A bulk emulsion plant has been added in the vicinity of the relocated truck shop. <br />8. Coloring Cor the mine areas and backfill areas is slightly different From the previous map (no <br />changes to the topography in these areas, just color changes). <br />9. The Enhanced Management Practices (Storm Water) pond stems (UU6 through UI I) have been <br />added to the map. Previously these ponds were shown in Volume 1 V. Appendix 6. Drawing 1 of <br />the Amendment No. 8 application. <br />IU. The fuel farm area has been relocated from the area shown on Drt+ving C--t. in Volume I of the <br />Amendment No. 8 application. back to the existing area. <br />I I. The new crusher facility layout has been placed on the drawing, including the load out bin, the <br />primary crushers. the secondary crushers. and the lime silo. <br />I2. The Phase IV External Storage pond has been removed. <br />13. A road has been added across the embankment of the Phase L 11. ^I External Storage Pond to the <br />Phase ll pumps. <br />11. The substation has been placed in its new location in the vicinin of inhere the Plrase 1 V External <br />Storage Pond +vas previously located. <br />I i The power lines to the substation and from the substation hate been relocated to match new <br />locations based on the new substation location. <br />I6. The granodiorite borrow area has lien added. <br />17. The locations of two water tanks have been added. <br />l8. Arun of mine stockpile has been added adjacent to the Arequa Gulch Overburden Storage Area. <br />19. The laboratory has been labeled on the drawing. <br />2U. The Victor Landfill Borrow area has been located on the drawing. <br />2 L Several existing sedimentation ponds in the eicinip~ of Arequa Gulch hate been added and labeled <br />on the drawing. <br />22. Several existing sedimentation ponds in the vicinity of Squaw Gulch have been added and labeled <br />(as EMP UU7) on the drawing. <br />23. The legend has been modified to match the colors currently being used on the drawing and to <br />show EMP's. <br />21. The anticipated configuration of the topsoil stockpileh-isual berm south of the VLF has heen <br />modified slightly. <br />25. One new surface mine area has been added (within the footprint of Squaw Gulch Overburden <br />Storage Area). <br />26. Areas of historic underground development rock piles scheduled for removal have been added to <br />the map. <br />27. The ore stockpile at the primary crusher has been divided into t+vo smaller ore stockpiles. <br />28. The "Future LOB" has txen removed. <br />29. The two crusher area ponds have been replaced with EMP U 11. <br />3U. A cul-de-sac has been added on County Road 8~ near the Permit Boundary <br />31. The parking area at the ADRJLab has been labeled. <br />32. An interim haul road between Squaw Gulch and the Crusher has been added. <br />33. The ADR Parking Lot has been labeled, <br />3~1. The projects office has been added at the ADR Parking Lot. <br />35. The shading on the internal access road from the ADR to [he crusher Iras been enhanced for <br />clarity. <br />36. A Topsoil Stockpile has been added within the footprint of the Squaw Gulch Overburden Storage <br />Area. <br />