Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />999 <br />CC Cripple Creek & Victor Gold Mining Company <br />n ~ T A Joint Venture - ANGLOGOLD {COLORADO) CORP.. Manager <br />XT V Operations O1Kce <br />IIIXXX... P.O. Box 191 • 100 North 3rd Street <br />Victor, Colorado 80860 <br />(719)689-2977• Fax (719)689-3254 <br />Nand Delivered oCC//++L <br />May 9, 2001 RLVG4~c'ri..® <br />Mr. Berhan Keffelew MAY t 0 1001 <br />Senior Environmental Protection Specialist <br />Colorado Department of Natural Resources ~IYISIt1110f Minerals and GB01Ypy <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br /> <br />Re: /nformational Submitta/. M-1980-244, Cresson Project <br />Dear Mr. Keffelew: <br />Enclosed please find several items provided to update the Office of Mined Land Reclamation ("OMLR") on <br />previously submitted information. Included with this submittal are the following items: <br />• Attachment I -Drawing C-4c (a revised version of Drawing C~ from the Amendment No. 8 <br />application, Volume 1, Exhibit C) <br />• Attachment 2 - A list describing the changes that have been made to Drawing C~c. <br />• Attachment 3 - A set of full size Issued for Construction Drawings for the Phase IV area of the Valley <br />Leach Facility ("VLF'). <br />• Attachment 4 - A list describing the changes that have been made to the Issued for Construction <br />Drawings from the Amendment No. 8 drawings contained in Appendix 7, Volume V for the VLF. <br />• Attachment 5 - A set of Hydrologic Calculations supporting the drainage control changes made in the <br />Issued for Construction Drawings. <br />• Attachment 6 -Revisions to the Technical Specifications made as a result of the correction of several <br />errors. <br />• Attachment 7 -Drawing C-3 Revision B (an updated version of Drawing C-3 from the Amendment <br />No. 8 application, Volume 1, Exhibit C). <br />• Attachment 8 - A set of full size Issued for Construction Drawings for [he Phase 1, 11, lIl External <br />Pond. <br />• Attachment 9 - A list describing the changes that have been made to the Phase 1, 11, III External <br />Storage Pond Issued For Construction Drawings. <br />• Attachment 10 -Revised Table 5-3, Anticipated Equipment List. <br />Please do not hesitate to contact me if you have any questions about this information. <br />Sincerely, <br />Scott A. Lewis <br />Manager, Environmental Affairs <br />cc: Jane Mannon, Teller County Planning <br />