Laserfiche WebLink
<br /> <br />C:WHB\C82056\RN03\011400adq.doc 5 01/14/00 <br />~8. F_.chibit 8 requires a Table ojContents due m the vohrme of injonnation contained in this Exhibit. <br />.SAE calculutiocu and the waste water treatment plans are presently not included in the main table <br />ojcontents in Volume 1. <br />Twenrymile Coal Company submitted a revised E.~chibit 8 on l 1/19/99. The Division did not <br />receive a table of contents page for E,~dribit 8. The request for a Table of Contents for Exhibit 8 <br />remains unresolved. <br />62. As a result of issues raised during the midterm review, TCC submitted various information <br />concerning sediment pond design and the as-built configuration ojthese ponds. This information <br />was reviewed to determine whether the requirements ojRule 2.O.i.3(=1) are adequately addressed <br />for each sediment pond. <br />Generally, each pond now has a statement ojcertification that references particular design <br />information, whether it is original design information or informa[ion based on a survey of the <br />structure done by a registered land surveyor. A number ojisscres were ident~ed based after <br />review. <br />62. a) ,Ylarry of the surveys are not certified by the surveyor. Information gathered by Mr. Peter Epp for <br />Pond D, Fish Creek Loadout (tipple) pond, Pond B, Pond G, Fish Creek Borehole Ponds needs to <br />be signed and dated by the surveyor. <br />12/6/99 materials <br />The pond Dotage/storage diagram is legible and was signed and certified by the surveyor. The <br />Division requires professional engineer certifcations. It still needs a label as to where it is to be <br />filed in the permit. The principal spillway elevation shown on the does not agree with the <br />calculations submitted May 17, 1999. Please correct this discrepancy. <br />The pond G and pond Bstage/storage diagrams aze legible and were signed and certified by the <br />surveyor. They both need a label as to where they aze to be filed in the permit. <br />Assuntirtg the Division has received adequate design information, please assure that as-built <br />certifications reflect all new and existing design information, including reference to its location in <br />the permit. <br />No information was submitted for the Fish Creek Tipple (pond E). This item remains outstanding. <br />The Fish Creek Borehole treatment ponds have an adequate as-built certification as found in <br />Exhibit 8K. Map 32 was revised appropriately during Minor Revision 166. <br />62. b) Plate 1, titled Sedimentation Ponds, Energy Mines No.l and No. 2 and Eckman Park needs to be <br />properly labeled to indicate it is part of the Twenrymile permit # C-82-056 and to which exhibit it <br />belongs. If only one copy of this plate is to be used for all ponds, it should be properly referenced <br />by the as-built cert~cativn for each pond to which it applies, as jar as where it (the plate) can be <br />found in the permit. <br />