Laserfiche WebLink
letter to DMG February 10, 1993 3 <br />Page Permit Changes <br />Reclamation". The new table reflects a bonding amount of <br />$48,828.00 in Existing Reclamation Tasks and $17,643.00 <br />in Proposed Reclamation Tasks. Eastside Coal will <br />increase its Reclamation Bond to $49,000.00 to include <br />the revised reclamation costs as itemized in "Critical <br />Path Tasks during Reclamation, Existing Tasks." <br />Eastside Coal will notify DMG of construction plans of <br />any of the Proposed Tasks. At that time Eastside Coal <br />will increase its bond by the amount required to reclaim <br />that activity. <br />Sincerely, <br />Stephen Se <br />General Ma ger <br />SS/11 <br />Enclosures <br />