Laserfiche WebLink
iii iiiiiiiuiiiiiii <br />EASTSIDE COAL COMPANY, INC. <br />f?O. box 161 <br />Sil t, Colorado 81652 <br />(303) 8762944 <br />February 10, 1993 <br />Shawn Smith, Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />• 1~t1 9~~1 9r"` J <br />FEB~•1619793 <br />MiryF~~s~ ~~c~`` .,y <br />Re: Eastside Mine <br />Permit Number C-84-063 <br />Minor Revision MR-11 - Revision of Reclamation Plan text, and <br />Re-calculation of Reclamation costs. <br />Dear Ms. Smith: <br />Please find enclosed Eastside Coal's revised Minor Revision MR-11: <br />Revision of Reclamation Plan text, and Re-calculation of <br />Reclamation costs. The revised MR-11 reflects the comments made by <br />the Division in the letter dated February 4, 1993: the bonding <br />amount of $48,828.00 for Existing Tasks and $17,643.00 for the <br />Proposed Tasks. The Reclamation Plan text is revised to correspond <br />to these changes as well as clarify the Reclamation Plan <br />description. During the midterm review, DMG has re-calculated <br />reclamation costs. With these changes, the revised pages 107-114a <br />of the Eastside Mining and Reclamation Permit are enclosed. The <br />changes made are: <br />Pa4e Permit Changes <br />107 Paragraph 4 - omit. Repetitive. <br />108 Moved last sentence first paragraph to second paragraph <br />p. 108, last sentence. Clarification of text. <br />108 Third paragraph, last sentence. Omitted. Clarification <br />of Reclamation Plan. <br />