My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96553
DRMS
>
Back File Migration
>
Revision
>
REV96553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:12 AM
Creation date
11/22/2007 12:00:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/1997
Doc Name
WEST ELK MINE C-80-007 MR 229 DOZER SERVICE FACILITY
From
DMG
To
MIKE BOULAY
Type & Sequence
MR229
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMIMRY coned <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT 6 SPECIAL HANDLING <br />Task p~ Task Description ~ Cost (51 <br />79 ~ Topsoil all disturbed areas ~ 5157,447 <br />40 ~ Cover Ref use Pile Wi[h Subsoil ~ 533,063 <br />62 ~ Distribute topsoil over pad, pits, and roads ~ 51.190 <br />66 ~ Replace topsoil over drill pad ~ $270 <br />69 ~ Salvage topsoil from 1.2 mall.gal.Wacer tank pad ~ 5315 <br />71 ~ Replace topsoil on 1.3 mil L.ga 1. Watez tank pad ~ 5210 <br />48A ~ Respread topsoil on material storage bench (TRpfi 71 ~ 523,149 <br />77 ~ Replace topsoil on Lone Pine Gulch Fan bench ~ 59,193 <br />205 ~ MR-200; Replace Topsoil on DMSA Povarline Road ~ 5711 <br />301 ~ MR-209; Replace Topsoil on Lone Pine Gulch pipelines 5378 <br />221 ~ Replace topsoil on Shaft site and elec. borehole rd~ $58,908 <br />222 ~ Replace topsoil from stockpile pl ~ 541,627 <br />223 ~ Replace topsoil Erom stockpile p3 ~ $18,890 <br />224 ~ Replace topsoil from atotkpile p9 ~ $3,775 <br />225 ~ Replace topsoil from atotkpile p5 ~ 5153 <br />280 ~ Replace topsoil on deWa[. bh pad and road (MA 2121 ~ 5318 <br />101 ~ Distribute topsoil from NES to RPE ~ 512,671 <br />102 ~ Replace topsoil on RPE ponds ~ $2,826 <br />103 ~ Redistribute topsoil on RPE road ~ 5681 <br />109 ~ Redistribute topsoil from NEB to LRP ~ 515,027 <br />105 ~ Replace topsoil on add'1 mine entrance disturbance ~ 5657 <br />120 ~ Replace [opso it on NSS area ~ 56,752 <br />122 ~ Place topsoil on RPE area ~ $47,004 <br />133 ~ Replace topsoil on !Ri 214 drill pads. roads ~ $1,333 <br />156 ~ Replace topsoil on MR 218 disturbance areas ~ $5,737 <br />4Bb ~ Haul topsoil Erom TSS p5 to MSB cut slope ~ 54,381 <br />48e ~ Raul topao ll from TSS p5 [o MSB vest fill area ~ 51,346 <br />142 ~ Replace topsoil on Shaft p3 pad and light use road ~ 57,051 <br />lfi5 <br /> <br /> <br /> <br /> <br />____ ~ Topsoil diet. areas ac Lone Pine Gulch pond <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />_I______________________________________________________ <br /> <br /> <br /> <br /> <br />__________ <br />Subtotal IJ1: ...5:50,779. <br />sheet 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.