My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96542
DRMS
>
Back File Migration
>
Revision
>
REV96542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:11 AM
Creation date
11/22/2007 12:00:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Name
WEST PIT EXCESS SPOIL FILL
Type & Sequence
PR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• will direct surface runoff to the east and north into a permanent <br />drainage channel designed to pass safely the runoff from a 100 <br />year, 24 hour precipitation event. See the attached map for <br />complete details regarding the proposed construction of.the fill. <br />Reclamation, specifically topsoil <br />will be implemented consistent with the <br />which have proven to be successful on <br />reclaimed areas at Colowyo. <br />INSPECTION PLAN <br />replacement, seeding etc. <br />Section 2.05 of the permit <br />Streeter Fill and other <br />During construction of the Fill, Colowyo will provide the <br />following information in certified reports as required by Rule <br />4.09.1(11). <br />1. Inspections will be conducted at least quarterly during <br />the construction period and during the following specific <br />construction periods. <br />a. removal of topsoil and organic material <br />b. placement of underdrain system <br />c. installation of surface drain system <br />d. placement of fill material and <br />e. revegetation <br />• 2. The certified reports will be available for inspection by <br />the Division and, consistent with other monitoring <br />reports at Colowyo, copies will be submitted to the <br />Division in the Annual Reclamation Reports. The reports <br />will include a description of any appearances of <br />instability, structural weakness and other hazardous <br />conditions observed during the inspection. <br />3. Certified reports addressing the underdrain system will <br />include color photographs taken during and after <br />construction, but before the underdrain is covered with <br />spoil. <br />After construction, the West Pit Fill will be monitored <br />quarterly for the following items and reports will be submitted in <br />the Annual Reclamation Reports. <br />1. The groundwater piezometer well will be established in <br />the valley bottom and will be monitored quarterly for <br />water level and the other parameters consistent with the <br />present Colowyo groundwater monitor plan. For a proposed <br />location of the well see the attached map. <br />2. On a quarterly basis the survey monuments on the face of <br />the fill will be monitored for horizontal and vertical <br />• movement. For the proposed location of the monuments, <br />see the attached map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.