Laserfiche WebLink
-3- <br />10. Primary future Cropland(CR) _ PasturelandlPL) _ General Agriculture(GA) <br /> (Post-mining> X Rangeland(RL) _ Forestry(FR) Wildlife Habitat(WL) <br /> land use Residential(RS) RecreationtRC) _ <br />Industrial/Commercial(IC) <br /> (check one): _ Developed Water Resources(WR) _ Solid Waste Oisposal(WD) <br />11. Primary resent CroplandtCR) Pastureland(PL) _ General Agrlculture<GA) <br /> land use X Rangeland(RL) <br />Forestry(FR) Wildlife Habitat(WL) <br /> (check one): _ <br />Residential(RS) Recreation(RC) _ <br />_ IndustrlallCommercfal(IC) <br /> Developed Water Resources(WR) <br />12. Method of Mining: _ Quarry (QR) _ Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> Front-end loaders and scrapers to remove material to processing sites <br />13. On Site Processing: Solution (SO) Chemical tCH) <br />Thermal (TH> <br /> _ Heap Leach (HL) _ Vat Le _ <br />ach (VL) <br />14. Application fee: <br /> The application fee for quarry mining is $2,325. <br />The application fee for solution mining or any chemical or thermal processing <br />1s 53,100. <br />If none of these methods or processes are to be Included to the operation then the <br />application fee is $1,875. <br />An applicant will not be Issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warranties have been <br />approved. Alternatively, an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even if you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted 1n <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral Rules and Regulations 1n effect at the time the <br />permit is issued. <br />