My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96442
DRMS
>
Back File Migration
>
Revision
>
REV96442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:07 AM
Creation date
11/21/2007 11:59:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
2/6/2004
Doc Name
Postponing The Inspection
From
DMG
To
Bear Coal Company
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />February 6, 2004 <br />Daniel Beaz <br />Bear Coal Company, Inc. <br />17036 Opal Hill Drive <br />Pazker, CO 80134 <br />RE: Beaz No. 3 Mine, Permit No. C-1981-033, Bear Coal Company <br />Phase One Bond Release Application No. 3, (SL-3) <br />Deaz Mr. Beaz: <br />COLORADO <br />DIVISION OF <br />MIN &RALS <br />GEOLOGY <br />4EC LAMATION•M INING <br />SAFETY•sCIFNCE <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Due to the significant snow cover at the Beaz No. 3 Mine reclaimed site, the Division is postponing the <br />Phase One bond release field inspection until late spring or early summer of 2004. Rule 3.03.2(2) <br />requires that a bond release field inspection be performed only when the reclamation work can be <br />properly evaluated by the Division. The Rule further states that there may be seasonal limitations on <br />the timing of the field inspection. In this case, the postponement is necessary because the snow cover <br />will prevent a proper evaluation of the reclamation results. When the exact date of the bond release <br />inspection has been set, you will be notified. <br />If you have questions or need additional information, please contact me. <br />Sincerely, <br />{~~ 1~.. <br />J sep J. D'uflash <br />Environmental Protection Specialist <br />cc: William Bear (Bowie Resources) <br />Cazl Johnston (Office of Surface Mining) <br />c:/word/beaz3/sl3postponelet 1 <br />Office of Office of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.