Laserfiche WebLink
-5- <br />Responsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there are a <br />number of important requirements which you, as a pemtittee, should fidly understand. These requirements are listed below. <br />Please read and initial each requirement, in the space provided, to acknowledge that you understand your obligations. lf}rou do not <br />understand these obligations then please contact this Office for a full explanation. <br />~_ 1. Your obligation to reclaim the site is not limited to the amount of the fmancial warranty. You assume legal <br />liability for all reasonable expenses which the Board or the Office may incur to reclaim the affected lands associated <br />with your mining operation in the event your pemvt is revoked and fmancial warranty is forfeited; <br />/rti`< 2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a fording that the permittee violated <br />the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained in the <br />application or your permit misrepresent important material facts; <br />~_ 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br />substantial civil penalties, to you as permittee can result; <br />~~ 4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Boazd or Office; <br />_~ 5. It is yow responsibility to notify the Office of any changes in your address or phone number; <br />.~L 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the <br />mine site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />Reclamation Boazd; and, <br />c. the permit number. <br />JQ~ 7. The boundaries of the permit boundary area must be marked by monuments or other markers that aze clearly <br />visible and adequate to delineate such boundaries prior to site disturbance. <br />G9L 8. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions <br />listed in your application, as well as with the provisions of the Act and the Construction Material Rules and Regulations <br />in effect at the time the permit is issued. <br />