Laserfiche WebLink
Schedule of Operations <br />The mine is expected to operate from 5:00 AM to 9:00 PM. When the portable crushing plant <br />is on site. it runs about 14 hours per day 6 days per week. Operating hours will be based on <br />product demand. <br />Mine Area Details <br />The expansion's reserves are divided into mining areas with each area having multiple phases. <br />While one phase is being mined the previous phase will be reclaimed. Once an area's <br />reclamation earthwork has been completed the pit will be allowed to flood. This separation of <br />areas and phases will limit the overall disturbed area. Area details can be seen below. <br />Mining Areas <br /> Gravel Raw Topsoil Topsoil Overburden Overburden <br /> Area (acres) Tons* (t) Thickness (ft) Tonnage* (t) Thickness (ft) Tonnage*(t) <br />Area 1 Phase 1 4.84 183,038 0.80 b,872 3.00 25,768 <br />Area 1 Phase 2 4.88 180,] 03 0.80 6,928 3.00 25,98 ] <br />Area 1 Phase 3 4.38 190,309 L00 7,773 4.50 34,979 <br />Area 1 Phase 4 4.43 197,058 1.00 7,862 4.00 31,447 <br />Area 2 Phase 1 4.95 180,039 1.00 8,785 4.50 39,531 <br />Area 2 Phase 2 5.16 187,676 1.00 9,157 4.50 41,208 <br />Area 2 Phase 3 4.93 179,312 1.00 8,749 4.50 39,371 <br />Area 2 Phase 4 4.70 170,947 1.00 8,341 4.50 37,534 <br />Area3 Phase 1 5.50 306,2]0 0.30 2,928 0.00 0 <br />Area 3 Phase 2 4.84 269,464 0.30 2,577 0.00 0 <br />Area 3 Phase 3 5.18 288,393 0.30 2,758 0.00 0 <br />Area 3 Phase 4 5.45 303,426 0.30 2,902 0.00 0 <br />Area 3 Phase 5 4.45 247,751 0.30 2,369 0.00 0 <br />Total** 63.69 2,883,725 78,000 275,819 <br />* Topsoil and OB tonnage is based on the assumption that I.0 CYD weighs 1.1 t. Raw gravel assumes 1.5 t. <br />** Note: Total area is less than the permitted acreage. The remainder exists as undisturbed areas, roads, and <br />stockpiles. <br />4126104 Page Dfi <br />