Laserfiche WebLink
TRAPPER MINING INC. <br />SAND AND GRAVEL SITE <br />Table L-1. Summary of Reclamation Quantities and Cost Calculations. <br />Area Total Cost Total Total Reclamation <br /> Per Acre Acres Cost <br />Roads $10,386.62 1.13 $ 6,692.29 <br />Pond (Permanent) 5,874.00 *57 22,556.00 <br />Recreation Area Parking 5,874.00 5.33 7,514.02 <br />Recreation Area Access Road .00 0.87 .00 <br />Silt Basin 8,714.43 1 4,552.41 <br />All other disturbed areas 8,728.86 17.97 82,084.62 <br />Total 83.3 $123,399.34 <br />* The total pond acreage is 57 acres, however, the actual regraded area will <br />only be the shoreline and waterfowl habitat islands (approximately sixteen <br />acres). <br />0 <br />f <br />JMM/jb <br />12/85 <br />