Laserfiche WebLink
T MINING INC. • • <br />SAND JD GRAVEL SITE <br />Table E-2. Example of a typical reclamation schedule at the proposed sand and gravel operation. <br />Approximate Time <br />Activity Frame for Activity <br />Site Preparation <br />Topsoil removal to stockpiles (1) <br />Overburden removal to stockpiles (1) <br />Topsoil and overburden stockpile stabilization <br />1985 - 2006 <br />1985 - 2006 <br />Fall following stockpile construction <br />Regrading <br />Regrade mining areas 1, 2, 3 (1) <br />Regrade mining areas 4, 5, 6 (1) <br />Topsoil Replacement <br />Replace topsoil on disturbed areas and mining areas 1-6 <br />Seedbed Preparation and Seeding <br />Prepare seedbed <br />Seed perennials <br />Replace and/or plant cottonwood trees <br />Post Reclametion Period <br />Monitor plant establishment <br />Control noxious weeds <br />Control domestic grazing <br />Control erosion <br />(1) Actual date depends on pit development. <br />1996 - 1998 <br />2014 - 2016 <br />2014 - 2016 <br />2014 - 2016 <br />Fall following stockpile construction <br />2014 - 2015 <br />2014 - 2016 <br />Annually for 3 years <br />Annually for 3 years <br />Annually for 3 years <br />Annually for 3 yeacs <br />JMM/jb <br />8/30/85 <br />