Laserfiche WebLink
•6- <br />2. The Boazd may suspend or revoke this permit, or assess a civil penalty, upon a finding that the pemrittee violated <br />the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained inthe <br />application or yow permit misrepresent important material facts; <br />3. If yow mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br />substantial civil penalties, to you as permittce can result; <br />4. Any modification to the approved mining and reclamation plan from those described in yow approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; <br />^~ S. It is yow responsibility to notify the Office of any changes in yow address or phone number, <br />~ u ' 6. Upon permit issuance and prior tobeginning on-site mining activity, you must post a sign at the entrance of the <br />~IVI _ mine site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />c. the permit number. <br />7. The boundaries of the permit boundary area must be mazked by monuments or other markers that aze clearly <br />visible and adequate to delineate such boundaries prior to site disturbance. <br />8. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions <br />listed in yow application, as well as with the provisions of the Act and the Construction Material Rules and Regulations <br />in effect at the time the permit is issued. <br />9. Annually, on the anniversary date of permit issuance, you must submit an annual fee as specified by Statute, and <br />an annual report which includes a map describing the acreage affected and the acreage reclaimed to date (if there aze <br />changes from the previous yeaz), any monitoring required by the Reclamation Plan to be submitted annually on the <br />anniversary date of the permit approval. Annual fees are for the previous year a permit is held For example, a permit <br />with the anniversary date of July 1, 1995, the annual fee is for the period of July 1, 1994 through June 30, 1995. <br />Failwe to submit yow a~ual fee and report by the permit anniversary date may result in a civil penalty, revocation of <br />yow permit, and forfeitwe of yow financial warranty. It is yow responsibility, as the permittee, to continue topayyow <br />annual fee to the Office until the Board releases you from yow total reclamation responsibility. <br />10. For ioint ventureJpaztnership operators: the signing representative is authorized to sign this document and a power <br />of attorney (provided by the partner(s)) authorizing the signature of the representative is attached to this application. <br />Permit Condition: <br />I Y . A reportable spill is a spill of a~ toxic or hazardous substance (including spills ofpetroleum products) within the <br />`y1 ~ mined land permit area reportable to a~ Division of the Colorado Department of Public Health and the Environment, <br />the National Response Center, the Colorado Emergency Planning Commission, auy local Emergency Planning <br />Commission, local Emergency Planning Committee, or the State Od Inspector. The Mine Operator shall notify the <br />Division of Minerals and Geology (DMG) of a reportable spill within the mined land permit area using the same <br />timeframe required by the permit, license, notice, statute, rule or regulation governing the reporting of the spill to the <br />other appropriate agency. Notice of a reportable spill shall be FAXed to: Minerals Program Supervisor, Division of <br />Minerals and Geology, FAX (303) 832-8106. The FAX shall include atoll-back number of a responsible company <br />official for DMG staff to use as a contact. <br />