Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanment of Natural Resources ~~i~~ <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX:(3031832-8106 <br />DEPARTMENT OF <br />MINING PERMIT - COAL NATURAL <br />TECHNICAL REVISION DECISION FORM RESOURCES <br />Roy Romer <br />Governor <br />The Division of Minerals and Geology, Department of Natural Resources, lamesS LOChheaA <br />State of Colorado has proposed the decision stated below. The decision Eaecmrve Direcinr <br />wi 11 become effective upon the termination of the ten (10) day publ i c Michael B. Long <br />Division Director <br />comment period, pursuant to Rule 2.08.4(5>(b)(ii>. <br />Permit No.: C-81-024 Technical Revision No.: 13 <br />Submittal Date: April 25, 1994 Decision Date: August 22, 1994 <br />Revision Decision Type: Approved <br />Minel: Colorado Coal Mine No. 1 <br />Permittee: Kaiser Resources, Inc. <br />Description of Revision: Revised Vegetation Requirement <br />Change in Bond Amount: No Change <br />Area Changes <br />Disturbed Area (+/-) .0 Ac. Max. Disturbed Area (+/-) .0 Ac. <br />Affected Area (+/-) .0 Ac. Permit Area (+/-) .0 Ac. <br />Federal Land (+/-) .0 Ac. State Land (+/-) .0 Ac. Private Land (+/-) .0 Ac. <br />Revised Application Pages 2.05-5 Revised Maps None <br />PERMITTEE2 DIVISION OF MINERALS AND GEOLOGY <br />COLORADO DEPA~2TMENT OF NATURAL RESOURCES <br />// /:n ,i <br />Authorized Representative Authorized Represent~a/tive Q <br />DATE: DATE: ~/~~/y7 <br />Stipulations Attached Yes No XX <br />lIf this action pertains to a federal mine (coal or surface ownership) the <br />permittee must submit documentation that the application, including any <br />modifications resulting from the review, was sent to the agencies listed on <br />the Federal Agency Mailing List. For non-Federal mines 1 copy of the revision <br />must be sent certified mail to OSM at Suite 1200, 505 Marquette Avenue NW, <br />Albuquerque, New Mexico 87102. The project may not proceed until all copies <br />have been sent. <br />2Signature is required if stipulations are attached. <br />0002G <br />