My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96310
DRMS
>
Back File Migration
>
Revision
>
REV96310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:02 AM
Creation date
11/21/2007 11:58:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Revision
Doc Date
8/26/1994
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br /> <br />10. Primary future Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />(Post-mining) xx Rangeland(RL) _ <br />Forestry(FR> _ <br />Wildlife Habitat(WL) <br />land use Residentlal(RS) _ <br />Recreation(RC) _ <br />IndustriallCommercial<IC) <br />(check one): _ Developed Water Resources(NR) _ Solid Waste Disposal(WD> <br />11. Primary resent Cropland(CR) Pastureland(PL) General Agriculture(GA> <br />land use _ <br />Rangeland(RL) _ <br />Forestry(FR) _ <br />Nlldlife Habitat(WL) <br />(check one): _ <br />Residential(RS) _ <br />Recreation(RC) _ <br />_ Industrial/Commercial(IC) <br /> _ Developed Water Resources(WR) xX Gravel Quarry <br />12. Method of Mining : ~ Quarry (QR) _ Solution (SO) <br />12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br />Rock deposit removed by blastin.£, hauled by loaders/conveyors to processin.Q plant. <br />13. On Site Processing: Solution (SO) Chemical (CH) _ Thermal <TH) <br />_ Heap Leach (HL) _ Vat Leach <VL) <br />14. Application Fee: <br />The application fee for Quarry mining is 52,325. <br />The application fee for Solution mining or any Chemical or Thermal Processing <br />is 53.100. <br />If none of these methods or processes are to be included in the operation then the <br />application fee is 6.875. <br />The application fee for conversion to a 112 permit is 51,500. <br />112 Amendment application fee is 51,550. <br />An applicant will not be issued a reclamation permit until notified by the Division that <br />this application and the required performance and financial warrantees have been <br />approved. Alternatively; an automatic approval will occur where the Division fails to <br />notify the applicant/operator that the application has been denied. The final agency <br />action must be made within 120 calendar days from the date the application was <br />submitted. However, the performance and financial warranties must be approved by the <br />Division or Board before a permit will be issued even 1f you receive an automatic <br />approval. NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 7.2(2)). <br />It shall be a provision of this permit that the operations will be conducted 1n <br />accordance with the terms and conditions listed in your application, as well as with the <br />provisions of the Act and the Mineral. Rules and Regulations 1n effect at the ttme the <br />permit is Issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.