Laserfiche WebLink
5 <br /> Location in Application <br />Information Category Narrative Maps <br />2.04.8 Climatological Information val I Sec 4.9 NIA <br />2.04.9 Soils Resource Information Vol I Sec 4.7 Val II Fig a.7-i &a.7.2 <br />2.04.10 Vegetation Information Vol I Sec 4.8 Vol II Fig 4.8.1 & 4.8.2 <br />2.04.11 Fish and Wildlife Resources Information vollseca.s VoIIIFiga.s-t <br />Vol III Apx 1 <br />2.04.12 Prime Farmland Investigation vol I Sec 4.t.3 vol III Apx t <br />2.05.2 Operation Plan: Estimated Area for <br />Life of Operation vol I Sec 2.1 Vol II Fig 2.1.1 & 2.2.1 <br />2.05.3 Operation Plan: Permit Area vol I Sec 2.0; 2.1 & <br />2.2 vol IIFig 2.1.1; 2.2.1; 2.2.4 <br />thru 2.2.15 <br />2.05.3(1) Production Methods and Equipment Vol I Sec 2.o Vol I T6I 2.1-t <br />2.05.3(2) Operation Description Vol I Sec 2.0 Val II Fig 2.2-4 thru <br />2.2-15 <br />2.05.3(3) Mine Facilities Vol I Sec 2.2 Val IIFig 2.2-4 thru 2.2.15 <br />2.05.3(4) Ponds, Impoundments and Diversions Vol I Sec 2.3.4 Vol II Fig 2.3-4 & 2.3.5 <br />2.05.3(5) Topsoil (removal and storage) vol I sec 2.4 & 3.2 vol IIFig 4.7-1 & 2 <br />2.05.3(6) Overburden Nla NIA <br />2.05.3(7) Coal Handling Structures val I Sec 2.2.3 & <br />2.2.7 vol II Fig 2.2-15 <br />2.05.3(8) Coal Processing Waste and Non-Coal <br />Processing Waste Val I Sec 2.2.5 Val II Fig 2.2-s & 7 <br />2.05.3(9) Return of Coal Processing Waste to <br />Abandoned Workings NIA NIA <br />2.05.4 Reclamation Plan Vol I Sec 3.0 Val II Fig 3.1.2 thru 3.1-10 <br />and 3.9.11 <br />2.05.4(2)(a) Timetables Vol I Sec 3.8 VoI I TbI 3.7.2 <br />2.05.4(2)(b) Reclamation Cost Estimates vol I Sec 3.8 voI I Tbl 3.9.6 <br />2.05.4(2)(c) Backfilling and Grading Val l Sec 3.3 Vol II Fig 3.1-2 thru 3.1-10 <br />and 3.9.11 <br />2.05.4(2)(d) Topsoil (Redistribution) Val I Sec 3.a vol I Th13.3-i <br />2.05.4(2)(e) Revegetation Vol I Sec 3.5 Val 1 Tbl 3.4-1 <br />2.05.4(2)(f) Disposal of Debris, Acid-Forming and Toxic- <br />Forming Materials Vol I Sec 2.2.5 NIA <br />01 /14/04 <br />