My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96288
DRMS
>
Back File Migration
>
Revision
>
REV96288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:01 AM
Creation date
11/21/2007 11:57:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
7/23/1999
Doc Name
NEW HORIZON MINE PN C-81-008 BOND RELEASE APPLICATION NO 6 SL-6
From
DMG
To
OFFICE OF SURFACE MINING
Type & Sequence
SL6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />STATE OF iii iuiiiiiiiiu iii <br />COLORADO <br />_ <br />DIVISION OF MINERALS AND GEOLOGY <br />Deporlmem of Natural Resources <br />1 317 Sherman 51., Room 215 <br />Denver. Colorado 80203 D I v 15 1 0 N O F <br />Phune~ (3o3J 065-7567 MINERAL $ <br />FAX: (703) 83?8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> HIN ING•SA FETY <br />July 23, 1999 <br /> Bill Owens <br /> <br />Mitchell S. Rollings Oovemnr <br /> <br />Office of Surface Mining Greg E. Walther <br />Executive Director <br />Western Regional Coordinating Center Michael B. Long <br /> <br />1999 Broadway, Suite 3320 Dlmsion Dlreuor <br />Denver, CO 80202-5733 <br />Re: New Horizon Mine (Permit No. C-81-008) <br />Bond Release Application No. 6 (SIr6) <br />Dear Mr. Rollings: <br />This letter, in accordance with Rule 3.03.2(5)(a) of the Rules and Regulations of the <br />Colorado Mined Land Reclamation Boazd for Coal Mining, is to inform you that the <br />Division of Minerals and Geology has issued a proposed decision to approve Bond <br />Release Application No. 6 (SL-6) for the New Horizon Mine. This decision will be <br />published in the San Miguel Basin Forum, as soon as possible. Publication of the <br />notice initiates a thirty (30) day public comment period. If, within thirty days, there <br />aze no requests for an adjudicatory hearing, the decision will become final. <br />As an interested party, you have the right to an adjudicatory hearing as outlined <br />under Rule 3.03.2(6) of the Rules and Regulations. The request for an adjudicatory <br />hearing must be written and state with specificity the reasons why the hearing is <br />requested. The request must be received within thirty days of the first publication <br />of the proposed decision in the San Miguel Basin Forum. <br />If you have questions or need additional information, please contact me. <br />Sincerely, <br />I <br />Harry B. Ranney <br />Environmental Protection Specialist <br />HBR/JRC <br />M \O55\JRC\TEMP\CSLI1008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.