Laserfiche WebLink
• COMMENT ON FINAL RECLAMATION PLAN <br />With approval of this technical revision request, minor changes <br />will be made in the final reclamation plan for the bench. Three <br />proposals were made for the final reclamation configuration of this <br />area in the Blue Ribbon Stipulation Response, dated February 10, 1983. <br />We propose to use option 2 on page 11 of the Stipulation Response. <br />This option allows for partial backfilling of the mine bench with <br />approximately 17,000 cubic yards of material. The other portion of <br />this reclamation option will have been subsumed under this bench <br />stabilization project, i. e., the grading of bench fill to a slope <br />of 25°. <br />• <br />• -6- <br />