Laserfiche WebLink
to balance cuts and fills. The final reclamation plan will be approved by the owners of the <br /> property and the [Wining operations utilizing the input provided in Exhibit 1X-3, <br /> Maintaining a minimum 1% slope across the property will be necessary for positive <br /> drainage and ease of flood irrigation. This exhibit is based upon the the composite <br /> reclamation plan prepared by Scott, Cox & Associates for both pit sites and indicates the <br /> modifications which are proposed as a result of a review of all documents provided <br /> during the preparation of this report and the groundwater analysis that was undertaken in <br /> 1 July, 1996. <br /> 1 <br /> 1 -30- <br />