Laserfiche WebLink
• • iiiiiiiiiiniuiii <br />STATE OF COLUI~UU <br />DIVISION OF MINERALS AND GEOLOGY <br />Departmem ui Natural Resources <br />131 ] 7herman 51.. Ruom ? 15 <br />Dcnvcr, Colorado HO'_OS <br />Phony 13031 86fi-75fi7 <br />FAX: 171131 H 3 ?-H 105 <br />DATE: <br />TO: <br />FROM: <br />RE: <br />September 18, 1997 <br />David Berry <br />Joe Dudash V ~~ <br />I~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5. Lnchhead <br />Etecwlve Duecior <br />Michael B. Lang <br />Division Direciar <br />Technical Revision No. 1, Single Portal Bench Permit Changes, Bowie <br />No. 2 Mine, Permit No. C-96-083, Bowie Resources Limited <br />Bowie Resources has submitted Technical Revision No. 1, as abatement for NOV CV-97- <br />O14. Iterminated the NOV after I called the TR complete, since the abatement step was to <br />submit a complete TR. The TR submittal involves all of the changes that are relevant to <br />the operator going from a two bench operation to a single bench operation. Some <br />miscellaneous items were also included in the TR but I didn't think it was worthwhile to <br />have the operator submit a separate TR or an MR for those miscellaneous items. <br />I am requesting some assistance in reviewing this TR. I have already given the <br />geotechnical information to Jim Pendleton since you were on vacation. Concerning the <br />bond calculation, Bowie Resources did not recalculate the bond for these changes because <br />they thought that the changes would result in a decrease in the bond liability, not an <br />increase. I need someone to verify this. Thanks! <br />c:\wp61 \bowie2\mr4memo4 <br />