Laserfiche WebLink
111 IIIllIIIIIIII III • i <br />E~~A <br />Coa/Company Seneca Coal Company <br />May 4, 1998 <br />Mr. Jim Burnell RECEIVED <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 MAY 0 6 1998 <br />Denver, CO 80203-2273 <br />RE: Yoast Miae Permit C-94-OBZ, TRO9 Uivlsi0nOfMinerals&Geolo9Y <br />Dear Mr. Burnell: <br />Enclosed please find three copies of revised material addressing <br />the adequacy concerns in your March 3, 1998 letter with regard to <br />the application for TR09 to the Yoast Mine Permit C-94-082. This <br />technical revision provides the as-built report and certification <br />• for Haul Roads A and B. A revised set of the Haul Road A and B <br />drawings was included in this package. These drawings show the <br />actual location of riprap utilized along both haul road <br />corridors. <br />Enclosed are the insertion instructions into the PAP, responses <br />to each adequacy concern and the revised materials. Should you or <br />any other members of the Division have any questions regarding <br />this information, please do not hesitate to contact me. <br />Sincerely, <br />m~ <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Enclosure(s) <br />c: John Husband (BLM) <br />Larry Kline (OSMRE) <br />Gary Wendt (PWCC) <br />L <br />Seneca Coal Company • P.O. Drawer D • Hayden, Coloredo 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />