Laserfiche WebLink
<br />DIVISION 1-GENERAL REQUII2EMENTS <br />SECTION 01050 -FIELD ENGINEERING <br />I.OI SURVEYING <br />The Owner will field establish horizontal and vertical control poinu. The Owner shall also provide offset <br />staking of the centerline slurry wall alignment. <br />1.02 SUPERVISION <br />The contractor shall have supervision, be knowledgeable of the project requirements and proper installation <br />and constroaion procedures, and be available in the field at all times that work is progressing. <br />END OF SECTION <br />01/99 Section 01050 - Page l of 1 <br />