My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96134
DRMS
>
Back File Migration
>
Revision
>
REV96134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:55 AM
Creation date
11/21/2007 11:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999021
IBM Index Class Name
Revision
Doc Name
TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION OF STEGNER FARMS PIT SLURRY WALL LARIMER CNTY COLO
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />Materials not meeting the specified moisture content and dry density requirements, as determined <br />by the tests, shall be reworked until approved results are obtained. Reworking may include <br />removal, rehandling, reconditioning, rerolling, or combinations of these procedures. The <br />Contractor shall be entitled to no additional allowance above the prices of the work required to <br />achieve the placement moisture content and density specified in this section. <br />The moisture content of the earthfill material prior to and during compaction shall be distributed <br />uniformly throughout each layer of the material. As far as practicable, the materials shall be <br />brought to the proper moisture content by adding supplementary water, if required, to the material <br />by sprinkling on the earthfill and each layer of earthfill shall be conditioned so that the moisture is <br />uniform throughout the layer. <br />Density control of compacted earthfill shall be such that the dry density of the compacted material, <br />as determined by tests performed by the Engineer, shall conform to not less than 90% of its <br />Proctor maximum dry density. Material which does not meet these requirements will be rejected <br />and shall be reworked until a dry density equal to or greater than these requirements is reached. <br />3.06 PLACING AND COMPACTING <br />A. Compacted Fill <br />The material shall be placed in areas shown on the Plans in continuous and approximately <br />horizontal layers, not more than 12- inch loose lifts. The combined excavation and placing <br />operations shall be such that the materials will be sufficiently blended to secure the best <br />practicable degree of compaction and stability. <br />The material shall be compacted to 90% of the Standard Proctor as described in ASTM D-698. The <br />method of compaction shall be submitted to [he Engineer for approval. <br />END OF SECTION <br />01/99 Section 02290 -Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.