My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96134
DRMS
>
Back File Migration
>
Revision
>
REV96134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:55 AM
Creation date
11/21/2007 11:56:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999021
IBM Index Class Name
Revision
Doc Name
TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION OF STEGNER FARMS PIT SLURRY WALL LARIMER CNTY COLO
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION 1 -GENERAL REQUII2EMENTS <br />SECTION 01700 -CONTRACT CLOSEOUT <br />1.O1 CLOSEOUT PROCEDURES <br /> <br />The following project closeout procedure defines the responsibilities of the Convactor, Owner and <br />Engineer in closing the project: <br />Step 1: Contractor advises the Engineer in writing that he has reached <br />"Substantial Completion" and provides a list of items to be completed or <br />cortected. <br />Closeout may be conducted by areas or portions of the work if requested by the Owner <br />Step 2: Engineer observes the work to determine if it is substantially complete, and issues a "Punch List" of <br />items to be completed or cortected. <br />Step 3: Contractor completes and/or cortects all punch list items and notifies [he Engineer in writing that <br />his work is ready for final inspection. <br />Step 4: Engineer makes final examination. When the work is found to be acceptable, the Engineer will <br />prepare a final construction report and as-built plans. <br />END OF SECTION <br />Ol/99 Section O 1700 -Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.