Laserfiche WebLink
r <br />STATE OF COLORADO <br />MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />In THE MATTER OF: Adjudicatory Hearing ) FINDINGS OF FACT <br />Concerning Proposed Bond Release ) CONCLUSIONS OF LAM <br />Decision for Blue Ribbon Mine ) AND BOARD ORDER <br />File No. C-81-047 1 <br />This matter was presented in a hearing, after proper notice, before the <br />Colorado Mined Land Reclamation Board ("Board") on June 23, 1987, in Room 302 <br />of the Garfield County Courthouse, Glenwood Springs, Colorado. The Board <br />conducted the hearing to consider objections to the Colorado Mined Land <br />Reclamation Division's ("Division") proposed decision to partially release <br />reclamation bond for the Blue Ribbon Mine. <br />A quorum of the Board: Davis C. Holder, (Chairman), Dennis Donald, Chris <br />Jouflas, and Margaret Winter was present during the entire hearing and <br />participated in deliberation and voting on the matter. The hearing was held <br />in accordance with C.R.S. 34-33-125(6) and (7) and 2 CCR 407-2, Rule 3.03.2. <br />A taped transcript was made of the hearing. Pursuant to the authority vested <br />in the Board by C.R.S. 34-33-125 and 2 CCR 407-2, Rule 3.03.2, the Board <br />hereby makes the following Findings of Fact, Conclusions of Law and Board <br />Order. <br />Findings of Fact <br />1. Blue Ribbon Coal Co. owns and operated an underground coal mine known as <br />the Blue Ribbon Mine. The mine is located in Section 2, T13S, R92W of the 6th <br />P.M. <br />2. Blue Ribbon Coal Co. developed an adequate reclamation plan and received <br />approval for this plan from the Division under the permanent regulatory <br />program after adequate notice was given. <br />3. Blue Ribbon Coal Co. commenced final reclamation on November 20, 1985 and <br />has completed required backfilling and grading operations in a manner which is <br />consistent with the approved final reclamation plan. Reclamation activities <br />completed include backfilling of the highwall and access road, covering and <br />stabilizing the mine bench, and smooth grading and stabilizing all areas. <br />Three sediment ponds remain to effect sediment control. <br />4. Blue Ribbon Coal Co. requested partial bond release for backfilling and <br />grading operations on November 6, 1986. <br />5. Proper notice and comment procedures were followed for consideration of <br />the bond release request by the D1vlsion. Exhibit I to this hearing details <br />the sequence of these procedures and is hereby included by reference. <br />6. The Division issued a Proposed Decision on March 20, 1987 to partially <br />release bond for backfilling and grading. <br />