My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96104
DRMS
>
Back File Migration
>
Revision
>
REV96104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:54 AM
Creation date
11/21/2007 11:56:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
9/16/1993
Doc Name
PN C-81-044 WILLIAMS FORK GAIN LOSS STUDY
From
CYPRUS EMPIRE CORP
To
MLRD
Type & Sequence
RN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1313 Sherman Si., Room 215 <br />Denver, LO R0203 <br />Phone: (3031 866-3567 <br />FAX: 1303183?-8106 <br />pF COQ <br />a~~~Rb.. <br />~' o <br />.~T~. <br />Ruy Rrmer <br />Governor <br />Mie hael B. long; <br />Division D~rec~o~ <br />DATE: September 13, 1993 <br />TO: Janet Binns <br />FROM: Susan Burgmaier C~(~ <br />RE: Eagle 5 and 9 Mines (C-81-044) <br />Permit Renewal 02 <br />Per your request, I have reviewed construction certifications for impoundments at the Eagle <br />5 and 9 Mines. I have the following comments concerning the drawings. <br />1. The drawings don't appear to be numbered for placement in the approved permit <br />application package. Unless you already have this information, the operator should <br />number the exhibits. <br />2. Rule 2.05.3(4)(a)(i)(B) requires the operator to submit cross sections of impoundments. <br />The drawing depicting the sewage lagoons includes cross sections. The others (5-P5, <br />5-P6, and 5-P7; 9-P2; and 9-P3) do not. Please have the operator provide cross sections <br />of the ponds and embankments as reyuired. <br />3. Please have the operator provide details for the emergency spillways for ponds 9-P2 and <br />9-P3, as required by Rule 4.05.6(7). Specifically, we need dimensions of the depth, <br />width, length, and sideslopes, and specifics of any channel lining in place. <br />SLB\091393.WP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.