My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96096
DRMS
>
Back File Migration
>
Revision
>
REV96096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:54 AM
Creation date
11/21/2007 11:56:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
12/9/1983
Doc Name
TR FILE C-055-82
From
MLRD
To
SUNDANCE COAL CO
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i i i i i i i iii i i i i i i iii <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Richard D. Lamm <br />Governor <br />December 9, 1983 <br />P1r. Art Van Sant <br />Sundance Coal Co. <br />P.O. Box 751 <br />Trinidad, Colorado 81082 <br />Re: Technical Revision, File No. C-055-82 <br />Dear Mr. Van Sant: <br />The Division has reviewed your technical revision application for <br />expansion of the refuse pile submitted July 21, 1933. <br />The Division is proposing to approve the application at this tune with <br />three stipulations. <br />The stipulations are as follows: <br />Stipulation No. l: <br />THE PERMITTEE SHALL COMPLETE A SITE-SPECIFIC SOPHISTICATED <br />MATHEMATICAL STABILITY ANALYSIS OF THE AMENDED CONFIGURATION <br />PROPOSED FOR THE COAL PROCESSING WASTE PILE. THE PERMITTEE SHALL <br />SUBr4IT THAT ANALYSIS, FOR REVIEW BY THE DIVISION, NO LATER THAN 90 <br />DAYS FOLLOWING APPROVAL OF THIS TECHfVICAL REVISIOfV APPLICATION. <br />THE PERMITTEE SHALL RESTRICT PLACEMENT OF COAL PROCESSING WASTE TO <br />THE TWO LOWER-MUST 50 FOOT THICK TERRACE BENCHES OF THE PROPOSED <br />AMENDED WASTE PILE, UNTIL THE DIVISIOfJ HAS APPROUED THE STABILITY <br />ANALYSIS AND CORRESPOiVDING DESIGN. IN THE EVENT THAT THE STABILITY <br />ANALYSIS DETERMINES THAT THE SLOPES OF THE PROPOSED AMEfVDED COAL <br />PROCESSING WASTE PILE WILL NOT ATTAIN THE REQUIRED MINIMUM STATIC <br />SLOPE SAFETY FACTOR OF 1.5, SUfJDANCE COAL COMPANY SHALL REDESIGN <br />AND RECOfVSTRUCT THE THEfV EXISTING EMBANKMENT TO COfVFORM 4lITH A <br />DESIGN SUBSEQUENTLY APPROVED BY THE DIVISION. IN SUCH AN EVENT, IF <br />AiV ACCEPTABLE REOESIGN HAS NOT BEEN APPROVED BY THE DIVISION WITHIN <br />90 DAYS FOLLOWING THE SUBMISSION OF THE ORIGINALLY REQUIRED <br />STABILITY ANALYSIS, SUNDANCE COAL COMPANY WOULD BE ORDERED TO CEASE <br />DEPOSITION OF COAL PROCESSING WASTE. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.