My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV96051
DRMS
>
Back File Migration
>
Revision
>
REV96051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:52 AM
Creation date
11/21/2007 11:55:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
7/5/1994
Doc Name
Remarks to MCCs response to 1st adequacy comments
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
PR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Revision No. 5 - PAR 2 <br />July 5, 1999 <br />Page 7 <br />world. Equally voluminous research and theory has been <br />presented regarding the boundary effects of topographic <br />relief, bedrock dip and structural discontinuities, such as <br />joints and faults. Jumbo Mountain occupies a position <br />somewhere near the discontinuity end of this conceptual <br />spectra. The landslide impacted steep-dipping topographic <br />free faces will undoubtedly belie most of the infinite <br />theories. <br />However, regardless of the debate over which scientific study <br />more accurately estimates the chances of subsidence impacts, <br />the proof will lie in the monitoring. The Division will <br />require MCC to monitor for impacts regardless of the <br />prediction. Are the landslides exacerbated by undermining? <br />Are the springs diminished or relocated as a result of <br />subsidence? MCC should provide a plan, as previously <br />requested, to control subsidence and a monitoring plan to <br />ensure that material damage does not occur. <br />Miscellaneous <br />1. As drill hole completion and abandonment reports were <br />submitted for NOI No. CX-92-212-00, no further response is <br />required. <br />Notification to the adjacent landowner, Mr. Edwin Allen, <br />should comply with the requirements of 4.20.2, within the <br />appropriate time frame. This notification along with the <br />notification provided to Mr. Larry Mautz and the letter from <br />the BLM should be kept on file at the mine office. <br />3. The Division appreciates the addition of the B-seam mine plan <br />outline to Map 37A. No further response is required. <br />The Division would like MCC to consider a meeting to include <br />representatives from MCC and the Division to discuss some of the <br />outstanding issues regarding this revision. Perhaps a meeting will <br />speed up the final review of the application. Please call if you <br />have any questions. <br />Si c ely, <br />i <br />ristine E. J <br />Environmental <br />ion Specialist <br />CEJ\WP51\007PR5.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.