Laserfiche WebLink
<br />phases, mined slopes which are at the final buildou[ configurations will be reclaimed concurtent with mining <br />at lower levels and in later phases. <br />CAMAS has already initiated and will continue to perform pre-split blasting techniques at final cut slopes <br />within the proposed reservoirs and where required for slope stability. This perimeter control blasting technique <br />inhibits blast energy from affecting the rock mass outside the final cut line, thereby maintaining rock quality <br />and minimizing increases in in situ permeability. <br />Finally, timetables outlined above and discussed further below are based on volumes of material in-place <br />including saleable rock and overburden. Estimated durations of phases assume all material to be saleable rock <br />excavated at an assumed production rate based on recent sales and no corrections for waste factors were <br />applied. <br />G.WROlECr5~30.WbOTTE%'MMENDOS.TXT [V - 6 <br />