Laserfiche WebLink
-z- <br />~6. Name of owner of subsurface rights of affected lead: CAMAS Colorado Inc./Aggregate Division <br />If 2 or more owners, "refer to Exhibit 0". <br />7. Name of owaer of surface of affected land: CAMAS Colorado Inc./Aggregate Division <br />7.1 Names of the holders of any recorded easements on the affected land: <br />CAMAS Colorado Inc./Aggregate Division <br />8. ~e of mixing operation:~X _ Surface Underground <br />9. Location Informatioa: The center of the area where the majority of mining will occur: <br />COUNTY: Jefferson <br />PRILIC IPAL MERIDIAN (check one): XX 6th (Colorado) 10th (New Mexico) Ute <br />SEC'.:ION (write number): S 10 & 11 <br />TOW1dSHIP (write number and check direction): T 5 North XY South <br />RANGE (write number and check direction): R 70 _ East XX West <br />QUP"~TER SECTION {check one):(1) XX NE NW XX SE SW <br />QUARTER/QUARTER SECTION (check one):(1) XX NE XX NW XX SE XX SW <br />GENERAL DESCRIPTION: (the number of miles and direction from the nearest town and the <br />approximate elevation): APProximately 1.5 miles south of the town of Morrison. <br />Elevation between 6,400 ft and 7,500 ft. <br />(1)F,ctive mining areas are in the NA, NE & SE 1/4-1/4 sections of the NE 1/4 of Section 10, & <br />10. Primary future (Poet-miaiag) lead uae (check one): in all 4 1/4-1/4 sections the-SE 1/4 <br />of Section 10. <br />_ Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry{FR) Wildlife Habitat(WL) <br />_ Residential(RS) Recreation(RC) Industrial/COmmercial(IC) <br />XX Developed Water Resources(WR) Solid Waste Disposal(WD) <br />11. Primary present land uae (check oae): <br />Cropland(CR) Pastureland(PL} General Agriculture(GA) <br />_ Rangeland(RL) Forestry(FR) XX Wildlife HabitatlWL) <br />_ Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />12. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Drill. blast load shovel /1 ~adarL hanl (SO-t nn and Rfl-ton trnckaL rnish .crraan- <br />May also use in-pit mobile crusher and field conveyors. <br />13. On-Site Proceseiag: XX Crushing/Screening <br />13.1 Briefly explain on-site processing: <br />Raw material from the quarry is fed into a primary crusher then through a plant with a <br />secondary crusher and multiple screening lines to create a variety of dry and washed <br />stone pro ucts rangzng in size rom structure i t roug an steps ou ers. <br />List any designated chemicals or acid-producing materials to be used or stored within <br />permit are_a:5ee attached list & key map (Application pages 2A & 2B), & in addition to <br />attached list: Praestol 2540 (flocculent, non-toxic). <br />