Laserfiche WebLink
'r <br />^ B. Product transporatian by rail Not Applicable _ <br />^ 1. Chemical treatment (describe) <br />^ 2. Oiling - - <br />_ ^ 3. Other (describe) <br />^ 4. No controls ~ <br />Comments: No major problems have been encountered controlling dust under <br />the current permit no. (C-13, 034- ) and none are anticipated for the modi- <br />fication. The ultimate pile size is muchlarger u e ra e o p~ement anc~+ <br />scale~of operation is anticipated to be only slightly arger t an at present. <br />Due to p is ing o construction; Te pile wil a rec acme as ibis constructe.~ <br />Itemize costs of materials and a ui ent: Water truck: Ca ital Cost: $85,000.00 <br />q pm P <br />Operating Cost: $55.60/hr. w/operator. acuum ruc api a os $120,000.0 <br />Operating Cost: r w opera or. ompac or s eeps oo api al Cost.: <br />$ pera ing os r. w opera or ec st. <br />( & an ase & _ ase = a e = <br />$ 6, 72.00 P ase V = 73, Temporary ee ing: opsoi i es 2,500.00 <br />Su soi Pi es: ,7 <br />Signature of person authorized .to supply data: .Gv~~GO (~pr~-~v <br />Dennis Conn, Director o Permitting <br />Typed name and title: & Environmental Compliance Date s-zz-8(o <br />Company Name West Elk Coal Co., Inc. Telephone No.: (303) 929-5015 <br />Mailing Address PO Box 591 Somerset, CO 81434 <br />Form APCD: 108(a) (9/83) <br />- Page 7 <br /> <br />