My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95975
DRMS
>
Back File Migration
>
Revision
>
REV95975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:49 AM
Creation date
11/21/2007 11:54:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977057
IBM Index Class Name
Revision
Doc Date
10/14/1988
Doc Name
LIMITED IMPACT OPERATION APPLICATION FORM
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-6- <br />Exhibit D - Reclamation Plan (continued) <br />2, Specify the maximum gradient of reclaimed slopes (horizontal vertical), <br />We recommend 3:1 or gentler for purposes of stability and revegetation <br />establishment. If you propose steeper slopes you should include a <br />,)ustification that supports the proposed postanining land use and demonstrates <br />compliance with the applicable performance standards of Rule 6, <br />3. Specify the thickness of topsoil to be replaced. We recommend using at <br />least 12 inches of topsoil material to enhance root penetration and hasten <br />revegetation. <br />4. Specify when the site will be seeded - late fall or early spring. Note <br />how the seedbed will be prepared to eliminate compacted conditions (e.g., <br />plowed, chiseled, disced). Note whether fertilizer will be utilized, and if <br />it will, then note the type of fertilizer, application rate and how it will be <br />incorporated Into the soil. <br />5. Specify the grass, forb, shrub and tree species to be planted and the <br />applicable quantities. Specify the quantity of each grass and forb species as <br />pounds of pure live seed per acre and the number of each species of shrubs and <br />trees per acre. <br />6, Specify the application method for grass and forb seeding, If the seed is <br />to be broadcast, the application rate should be twice the rate required for <br />seed drilling, and the seed should be raked or harrowed after application, <br />7. Specify the kind of mulch to be used and rate. of application. <br />8, Specify any ponds, streams, roads and buildings that will remain after <br />reclamation, These features must be shown on the Exhibit E -Map. If ponds <br />are part of the reclamation plan, the slopes can not be steeper than 2:1, <br />except from 5 feet above to ]0 feet below the expected waterline where slopes <br />can not be steeper than 3:1. Where wildlife habitat is the proposed future <br />land use, shore lines should be irregularly shaped to promote a diverse <br />wildlife habitat. <br />9. Specify the reclamation treatment of any waste rock dumps, tailing <br />impoundments, underground mine openings, buildings and other features <br />specified in your mine plan but not previously addressed in the reclamation <br />plan narrative. This should describe the measures taken to minimize <br />disturbance to the hydrologic balance, prevent off-site effects, and provide <br />fora stable configuration consistent with the proposed future land use. <br />10. The maximum amount of financial warranty for a Limited Imp~~t Operation is <br />x5000.00.* If you wish to conmit to a x5,000.00 financial war nty, then you <br />do not need to provide an estimate of reclamation costs. If y~. want to post <br />a financial warranty in a lesser amount, then you must provide an estimate of <br />the actual costs to reclaim the site based on what it would cost an <br />independent contractor to complete reclamation Including unit costs for the <br />following activities as appropriate to the operation: backfilling, grading, <br />topsoil application, seeding, mulching, fertilization, and labor. <br />* The Board will assess a financial warranty not to exceed x15,000.00 for aqy <br />mining operation which uses cyanide compounds in a leaching process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.