Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />~ Agenry or organ¢ation name :OMG <br /> <br />Task C : 05a State : Cdorarb Permitljob8 : M-1980-146 <br />Date : 12/142000 County : La Plata Abhrevialion :none <br />User : SSS Site :Montoya Pif Filename : Mf46-05e <br /> <br />Pennil or other lob action : TR-001 <br /> <br />Task description : Smooth grade pit lloo/ <br /> ~ <br />HOURLY EQUIPMENT COST Basic machine :Cat 09N (1995) Horeepower : 370 <br /> Blade type : Seml-Universal <br /> Attachment no. 1 : ROPS Cab Shia basis : f per day <br /> Atlachmenl no. 2 : /-shank ripper <br /> <br /> Utilization % Cost date source ; (CRG) <br />Cost Breakdown : Ownership cost/hour : 341.85 NA <br /> Operating cosVhour: E81.00 100 <br /> Ripper op. cost hour : E2.7B 25 <br /> Operator cosUhaur : E23.12 NA <br /> Total unit cosUhour : 3148.75 Total Oeel cosUhour : (148.76 <br />t;- _ .- <br />t -'" - , , <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 43,560 LCY factor : NA vduma'. 47,660 LCY <br />Source of quantity take-oft :Assume 27 ace <br />Source of est. swell factor : NA <br />Average push distance : 50 legit <br />Unadjusted hourly production : 1696 LCYlhr <br />Material consistency description <br />Compactetl011 or embankment <br />Average push gradient: 0.00 % (pas) <br />Average site altitude : 6,800 legit <br />Malarial vreight : 2,400 Ibs/LCY <br />Material weight description <br />clay and aravwl - Orv <br />/ ec.Rlac. <br /> <br />Operator skill : <br />0.75 Source <br />/avg.) <br />Material consistency : 0.90 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job eRcienry: 0.83 (1shiNtla <br />Spoil pile : 0.70 (Intl-m! <br />Push gradient : 1.00 (Caf HB <br />Altitude : 1.00 (Cal HB <br />Malarial weight : 0.96 (Caf HB <br />Blade type : 1.00 (S or U; <br />Net corregion : 0.36 <br />Adjusted unit production : 637.08 LCYlhr <br />Adjusted Oeat production : 677.08 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 88.37 Hours <br />Unit cost : 30.233 ILCY Total job cost : 510,170 <br />:_ •- e"s <br />a .,,~z~fitr., alum, .~~ :w„'~=» i~~ :.. '.~~_ f~ '~ a?"si: <br />