Laserfiche WebLink
• t <br />• <br />EXHIBIT "G" <br />WATER INFORMATION <br />(a) Statement that the operation is not expected to directly <br />affect surface or ground water systems. <br />As stated earlier in this application, this will be a dry pit <br />operation with no effect on water rights or hydrology of the <br />surrounding area, <br />(b) Ifi the operation is expected to directly afifiect surface <br />or ground water systems: <br />(i) (ii) (iii), There are no water resources or aquifers <br />• that will be affected by this operation. As a dry pit op- <br />eration, there will be no dewatering involved. <br />(c) Estimate of the proaect water requirements. <br />No water will be required for this dry pit operation or in <br />reclamation. <br />(d) Pro,iected amount from each source of water to supply <br />this pro,iect. <br />This dry pit operation will have no water requirements. <br />(e) Affirmatively state that the operator has acquired or <br />applied fior a NPDES Permit_ <br />The operator has a Brick Institute of America Group <br />Stormwater Permit, ID(t 1024. <br /> <br />