My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95933
DRMS
>
Back File Migration
>
Revision
>
REV95933
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:48 AM
Creation date
11/21/2007 11:53:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977320
IBM Index Class Name
Revision
Doc Name
EXHIBIT B INDEX MAP
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• 6.7 Sipns and Markers <br />The applicant commits to placing the required signs at the <br />access road and marking the boundaries. <br />Reclamation Plan Item: <br />(d> As stated earlier, topsoil will be segregated and stock- <br />piled. There will be no spoil to be compacted or graded. <br />The fallowing seed mixture will be used as per S.C.S. Recom- <br />mendations: <br />Variety Species % of <br />Niner or Vaughn Sideoats grama 30 <br />Hatchita, Covington Blue grama 0 <br />Pastura, Cimarron Little bluestem 15 <br />Nezpar, Paloma Indian ricegrass 15 <br />Arriba, Barton Weste0"rn he tgrass 20 <br />~,re4~f~ + 100 <br />Mix PLS/A <br />1.35 <br />~01,p 0.30 <br />0 7~~ ~T '0.53 <br />~~ 0.90 <br />60 <br />- g / /,~ 4.68 ~l{.b~bf/~ <br />The seed mix will be planted by a drill with adequate agita- <br />tor if possible. If it is necessary to broadcast the seed, <br />the seeding rate will be doubled. <br />• The seed mix will be planted by a drill with adequate agita- <br />tor. The seed houses-in th~area have an adequate supply of <br />these varietie s Late Fall~eeding is preferred. If this is <br />not possible, this seed wilt be planted in the early Spring. <br />lel Schedule indicating how and Then reclamation mill be <br />implemented. <br />li) (ii) liiil estimate of periods of time required for <br />various phases of reclamation, size and location, sequence. <br />Phase - Affected Area <br />Acreage -20 A <br />Mining Time - 50 years <br />Reclamation Completion - Reclamation will follow mining as <br />closely as possible over the 50-year time frame. Final and <br />complete reclamation should be done within 2 years of finish <br />of mining. <br />(~ ~~~I <br />(f1 Description of each of the following: ~~'~(,',,~~ )/~ ~l <br />(iI Final gradin¢ ~r~''`~'" V 0~^`G <br />• Pit floor will be finished at 4H:SV or flatter, <br />ramping into the highwall. <br />(ii) Seedine types, mixture, quantities, time of seedine. <br />See (dl above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.