Laserfiche WebLink
<br />r~ <br />Barbara Hubbs <br />Ted R. Hubbs Family Trust <br />7994 E. Saddleback DR <br />Kingman, AZ 86401 <br />iii iiiiiiiiiiiiiiii ~ <br />October 31, 2000 <br />Division of Minerals and Geology <br />Depan:ment of Natural Resources <br />1313 Sherman St. Room 315 <br />Denver. Colorado 80203 <br />Re: Hubbs Pit, Permit No. 1987-088, Technical Revision-l <br />Received <br />OCt 3 12000 <br />Divisio1ruj pfnMineras& Geolo9Y <br />PU~;? IC F:i_~ COPY <br />SITr~:rluht,s P,i ~ <br />T~Z-~1 <br />Reclamation ~~~esi ated 13 of Phase I will not commence until the completion <br />01' Phase III-b. e tota~of~hase II pit floor will commence on completion of the <br />mining of Phase I-a. These areas will be used~s cr~u~jing stockpile areas. <br />Vu'hen mining goes to Phase III-c then Phase l~vi~ie reclaimed. Phase Ill-b will be <br />a~ a stockpile area. <br />2. ']'here will be 2 acres left for cattle feed area in Phase I. <br />3. Revision to split Phase III into three phases: III-a lower 113, III-b midle 113, <br />I[I-c upper 1/3. <br />4. 1 n Phase II the underground oil pipeline has been removed so that area has been <br />mined. In Phase III-a the above ground gas line has also been removed. <br />SincereJ~ <br />~r <br />Barbara. Hubbs <br />