My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95813
DRMS
>
Back File Migration
>
Revision
>
REV95813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:43 AM
Creation date
11/21/2007 11:52:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Name
MINING AND RECLAMATION PLAN MT GUNNISON 1 MINE
Type & Sequence
TR56
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. MINING AND RECLAMATION PLAN <br />MT. GUNNISON NO. 1 MINE <br />January, 1986 <br />Revised April, 1989 <br />Revised October, 1989 <br />The direct mining costs attributable to the Post-F seam, based on <br />Mt. Gunnison experience, will exceed market prices prevailing for <br />the North Fork Valley Coal. Consequently, mining of the Post-F <br />seam coal is not economically viable. <br />3.4.7 Manpower Requirements <br />Existing and anticipated manpower requirements are shown in Table <br />3.4.4.A. Future manpower projections were based on existing <br />contracted coal sales and are subject to revision dependent upon <br />new contracts for additional coal sales. Future sales cannot be <br />projected at this time with any degree of accuracy due to extremely <br />soft market conditions. <br />3.4.8 Subsidence <br />The effect of mining-induced subsidence on renewable resources, <br />structures, and geologically unstable areas in the 5-year permit <br />area is discussed in a report entitled Subsidence Evaluation for <br />Mt. Gunnison No. 1 Mine. This report is included in this Mining <br />and Reclamation Plan as Exhibit 3.4.S.A. ~ supplemental,Subsidence <br />Evaluation is included in Exhibit 3.4.A.6. This is an evaluation <br />of the performance of F seam subsidence to date and predictions for <br />future mining in the 5-Year Permit area. WECC submits subsidence <br />monitoring reports on a semi-annual basis in a format approved by <br />the Division. <br />~J <br />3-78A <br />
The URL can be used to link to this page
Your browser does not support the video tag.