Laserfiche WebLink
• <br />• <br />• <br />Southfield Mine Minor Revision Request No. 20 -South Fan Installation • 20 <br />BONDING REQUIREMENTS (3.0) <br />The proposed south fan installation will result in approximately 0.46 acres <br />of additional disturbance. EFCI has determined the estimated cost to <br />reclaim the associated disturbance in the unlikely event of a bond forfeiture <br />at approximately 56,713. Supporting bond reclamation calculations are <br />included in this revision submittal as Appendix B, Bonding Calculations. <br />ACL lnc. • P.O. Bns 774018 • Srran6oat Springs, Cabrada 80477• l303)R79-6160 <br />