Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />999 <br />• • <br />Truck Cycle Trme Sheet 3 of 3 <br />Exchange = 0.70 min. Adz. for altitude = 0 .70 min. <br />Load = 3.838 min. 4 .26 min. <br />Maneuver S dump 1.20 min. = 1 .20 min. <br />Travel Time Iha ul S r eturn): <br />Road cond. desc r.: Fi <br />__ rm, smooth, rolling dirt/lt. surfaced <br />______________________________________ road, maintained <br />_____________________ <br />Haul rou Ce <br />Road Length Grade Rolling Total Velocity Trave l t ime <br />seg. q <br />___________ IEt) <br />_________ res.(k <br />_______ ) res. 1}) <br />______________ res.(}) (fpml <br />_________________ (min) <br />___________ <br />_ <br />1 ],920 0.50 3.00 3.50 2223 3. 69 <br />2 ],392 3.00 3.00 6.00 1599 9. ]] <br />3 4,224 2.00 3.00 5.00 1695 2. 99 <br />9 10,000 6.00 3.00 9.00 999 10. 59 <br />S 5,890 6.00 3.00 9.00 949 6. 15 <br />6 B, 448 8.50 7.00 11.50 716 12. 05 <br />___________ _________ _______ ______________ _________________ <br />Haul time = _________ <br />39. ___ <br />]0 <br />min. <br />Return route ---- -- <br />1 B,99B -8.50 3.00 -5.50 3520 2. 59 <br />2 5,890 -6.00 3.00 -3.00 3520 1. 66 <br />J 10,000 -6.00 3.00 -3.00 3520 2. 89 <br />4 9,224 -2.00 3.00 1.00 3520 1. 20 <br />5 7,392 -3.00 3.00 0.00 3520 2. 10 <br />6 ],920 -0.50 3.00 2.50 3360 2. 99 <br />•1st fi last seg. adz. for accel./dec el. Return time = 12. 83 min. <br /> Total Tr uck Cycle Time = SB. 70 min. <br />Loader Uni[ Prod.- <br />__ 1]6.]6 <br />_______ LCY/Hr - Adj . for eEE icrency= 143. <br />______ 17 <br />__ LCY/Hr <br />Truck Uni[ Prod.= <br />__ 14.95 <br />_______ LCY/Nr - Ada . for efficiency= 12. <br />______ 11 <br />__ LCY/Hr <br /> Optimal number of trucks per loading unit 12 <br /> Selected number of trucks per loading unit 12 <br /> Hourly truck team pzoduc [i on 195. 31 LCY/Hr <br /> Net Hourly Truck/Loader Team Production 143. 17 LCY/Hr <br /> Ne[ Hourly Multiple T/L Team Production 143. 17 LCY/Hr <br />JOB COST: <br />Flee[ size <br />_ 1 <br />_______ T/L Team(s) Total Job Time: 785. <br />_______ 41 <br />__ Hours <br />Umt Cost $6.229 /LCY Total Job Cost: 5700,9 08 <br />