Laserfiche WebLink
Peak Project Management LLC <br />~:.~~,r-VED sa115 County Road 20.8 <br />Trinidad, CO 87082 <br />tit ~ ~ ~ 2006 Telephone/Fax: (719) 846-4975 <br />~ eclamation, Cell: (719) 859-0111 <br />pivis"~" ° ~ Safety , <br />fit,,,,„y and <br />August 30, 2006 <br />Mr. Kent Gorham <br />State of Colorado <br />Division of Minerals & Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Lorencito Canyon Mine Permit No. C-96-084 <br />Technical Revision No. 14 <br />Deaz Mr. Gorham: <br />I have revised permit page 2.05-58 to discuss the surface owner providing alternative soil <br />for use in lieu of borrowing soil from BA-3. The changes also discuss the use of topsoil <br />in achieving reclamation at the coal load-out prior to bond release for Industrial Land <br />usage. Page 2.05-60 is also included in this submittal as some unrevised text has shifted <br />to this page. <br />The land owner has submitted a letter to the operator regazding the above requests. A <br />copy of this letter is enclosed to be included in Exhibit 23-Page 94. <br />The reduction in topsoil to be spread at the loadout resulted in a minor reduction in the <br />calculated reclamation bond for the area. Page Exhibit 20-94 calculates the proposed <br />change. <br />I sent a request for an extension of the review time for this revision via facsimile today. <br />Please contact me if you have any questions. <br />Sincerely, / <br />~gn~Vt <br />Ronald G. Thompson <br />