My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95647
DRMS
>
Back File Migration
>
Revision
>
REV95647
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:36 AM
Creation date
11/21/2007 11:50:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
4/28/2004
Doc Name
Adequacy Review No. 2
From
DMG
To
Seneca Coal Company
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Roy Karo <br />Seneca Coal Company <br />Apri128, 2004 <br />Page 2 <br />Page 8 of Tab 19 indicates that the azeas of land that will be disturbed through the five-year <br />permit term are shown on Exhibit 20-1. As indicated in Tab 20 of the permit document Exhibit <br />20-1, 5-year disturbance boundary has been superceded by Exhibit 12-1, Operations Plan (Sheet <br />2 of 2). Please revise the reference to Exhibit 20-1 accordingly. <br />Please revise Tab 25 to include an updated table showing current open pits and ungraded azeas <br />associated with worse case disturbance. Please also review and revise the Bond Cost Worksheets <br />contained in Attachment 25-1 if necessary. SCC should provide the Division with an updated <br />estimate of worse case disturbance. Based on estimates from our recent site inspection, it <br />appears that SCC is at their worse case disturbance for the current permit term. <br />The Permit Index List of Exhibits needs to be updated in Tab 1. Please also ensure that all Table <br />of Contents in all tabs that aze affected by this revision, are appropriately updated. <br />Please remove the reference to Exhibit 19-1 and update Page 9 of Tab 19 with appropriate map <br />references. <br />Please condense the text that is spread out on pages 6, 7, and 8 of Tab 19. If possible this should <br />be condensed onto one or two pages. <br />On Exhibit 19-1 B, the area north of YPM-7 designated 2004 should be shaded green. This area <br />was previously approved as the 2003 variance area. Final grading, topsoil distribution and <br />seeding must occur in 2004 to be consistent with contemporaneous reclamation practices. A <br />portion of this area is included in the 2001-2002 designated area for backfill and grading and is <br />still under a pending cessation order. SCC must complete topsoil redistribution and seeding <br />activities at the 2001-2002 backfilling and grading area shown on Exhibit 19-1A by July 17, <br />2004. The Division has extended the time for abatement 180 days at this location. <br />If necessary, please make appropriate changes/updates to the Operations Plan -Topsoil <br />Removal, Exhibit 12-1A as a result of this technical revision. <br />Has the Highwall Mining Ground Control Plan been approved by MSHA? If this plan has been <br />approved, please provide the Division with this documentation. <br />The Division is concerned that the Highwall Mining Limit as shown on Exhibit 12-1 extends all <br />the way up to the permit boundary in two locations. Any subsidence effects have to be within the <br />permit boundary. SCC must adequately address subsidence effects. Angle of draw effects <br />associated with subsidence should be considered. On page 12-2-3 of Attachment 12-2, SCC <br />addresses Rule 4.23.2(6)(d), subsidence resulting from auger (hghwall miner). The first <br />sentence of this discussion makes reference to the engineering design analysis conducted by <br />
The URL can be used to link to this page
Your browser does not support the video tag.