My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95620
DRMS
>
Back File Migration
>
Revision
>
REV95620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:35 AM
Creation date
11/21/2007 11:50:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/26/2007
Doc Name
Cost Estiamte
From
Jim Stark
To
Joe Dudash
Type & Sequence
TR45
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity <br />Basis <br />Scraper Bowl (volume) Basis <br />Material weight : 2,650 pounds/LCY <br />Material description <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.11 LCY <br />Struck volume : ta.oo Lcr <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY •" <br />production regects volume per scraper pair on push-pull models <br />Cvcle Time : Job Condition Corrections : Site altitude (ft.) : 6, 750 <br /> Scraper Push dozer Source <br />Scraper loading time ' : 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />• load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"lira penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 2, 600 0.00 5.00 5.00 2218 1.35 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.35 minutes <br />Return route <br />table velocities are maz. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 519.27 LCY/hour "' Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />minutes <br />3.93 minutes <br />430.99 LCY/hour <br />2 scraper(s) <br />430.99 LCY/hour <br />430.99 LCY/hour <br />•' bevel time for each segment is adjustetl for acceleratioNdeceleretlan. Return time : 1.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.